STONE CHIP GUARD (Protective Material)

SPECIAL NOTATION:

The following items or operations were not considered during the development of any published basic refinish operation times. If any of these items or operations are required, they should be considered by the estimator.

• First Panel;

Add 0.5 per panel

• Each additional panel;

Add 0.3 per panel

INCLUDED:

• Up to a 12" height

DOES NOT INCLUDE:

• Texture matching

images\stone.gif

 

Footnotes found in a chapter contain vehicle-specific information. The content of footnotes is in addition to, and takes precedence over, information in the Guide to Estimating pages for the operation indicated.

REV. 8/06